Hooper Engineering
Railway Engineering
• Infrastructure inspection      


• Capital Planning 
           
       
• Track Design  
                      
• Tender Preparation               

• Materials Procurement   
                      
                    
• Construction Management   
Review existing track structure and advise on safety standards and
maintenance repairs

Reports on long term capital requirements for rehabilitation or for
increasing service capability

Spur construction; Yard and loading loop layouts

Preparation of construction tenders; managing the bid process

Materials represent 70% of most track contracts; buy your own materials and save contractor mark-ups of 10%-20%

Budget, schedule, site inspection, payment certificates and certification